Run the day
Structured huddles across four tiers, each with a fixed shape and a fixed length. Every problem raised gets one of six decisions, and each decision that creates work creates a tracked action with an owner and a date.
The shape
The structure is the point. A huddle that starts wherever the loudest problem is will never reach Progress, which is the stage that makes the previous huddle worth having.
2 min
Why the team is standing here. The safety moment, and anything the shift needs to know before it starts.
3 min
Who is here, who is absent, where cover has been agreed. Recorded, so a competency question later has an attendance record behind it.
5 min
The measures for this team, drawn from live operational data rather than a slide somebody prepared last night.
10 min
Open issues for this team, each one needing a decision before the huddle can move on.
5 min
What was committed last time, and whether it landed. The part most meetings skip.
The tiers
A problem the shift cannot resolve escalates to daily operations, then to weekly leadership. Escalation is a recorded decision with an urgency, not a conversation in a corridor.
The team on the floor, at the start of the shift.
Supervisors and functions, once a day.
Site leadership, weekly, on what the tiers below could not resolve.
The monthly view — patterns, not incidents.
Problems stage
The session records how many issues were reviewed and how many were not, so a problem nobody got to is visible afterwards rather than quietly absent.
Closing a huddle requires all five stages to have been visited, attendance recorded for every member, and the facilitator to sign the close declaration. Once closed it locks, so the record of what was decided cannot be tidied up afterwards.
Briefings
A safety message, a quality alert, an upcoming audit, a visitor on site, the plan for the day. Briefings are attached to the huddles that should carry them, with an active window and, where it matters, a required acknowledgement — signed by each person, so "everyone was told" is evidence rather than an assumption.
Assured execution health
A composite score per area of the site, built from the operational record rather than from a survey. The weights are set by you, and changing them needs approval — so the measure cannot be quietly tuned to flatter the result.
Whether scheduled work actually happened, on time, by someone qualified.
How quickly and completely findings were answered.
Whether the serious things were caught and handled ahead of the trivial ones.
Whether work was done when it was meant to be, not batched up before an audit.
Whether closed problems stayed closed.